Project Advisory

Take control of your project,
with timely decisions and real data.

Direct technical advisory on project planning, control and risk, for any industry. GRATOX, the platform we built to support that advisory, is the one we use with you so the data stays visible at all times.

Platform in beta, already available for testing.

Executive dashboard Live
Actual progress 63% ▲ Plan 58%
Schedule variance −7% SPI 0.92
Active risks 4 2 in alert
Planned vs. actual · last 6 weeks
Planned Actual
! 3 critical-path activities behind schedule
P6 · MS ProjectNative schedule import
DailyField production reporting
5+4Service lines: advisory and platform
AIDeviation reading and alerts
On site

Behind every decision is a real job site.

Before it's a data point on a dashboard, it's people on site making decisions every day.

Equipo trabajando en obra durante el día
Equipo de terreno en obra civil
Grúa torre en obra de infraestructura
The problem

Your project's information lives in five different spreadsheets.

Schedule in P6 or MS Project, progress in Excel, risks in an email, documents in a shared folder. By the time the weekly report lands, it's already late.

Without GRATOX

  • Actual progress is only known days after it happened on site.
  • Cross-checking the schedule (P6 or MS Project) with the production spreadsheet is manual work.
  • Earned and spent man-hours are calculated separately, almost always late.
  • Every manager asks for the same data in a different format.

With GRATOX

  • The field reports and the dashboard updates the same day.
  • The schedule (P6 or MS Project) is imported once and stays connected to actual production.
  • Man-hour and performance KPIs calculate themselves, with history.
  • A single executive dashboard, ready for any meeting.
How we work

Two service lines, one goal.

You can hire the advisory, use the platform, or both together; each project defines what it needs. Neither is a complement to the other: they're two complete ways to solve your project's management.

Line 1

Advisory Services

High-level technical consulting, for projects in any industry.

Talk about my project
1.1

Project Planning & Controls

  • Baseline development (EPC, Turnkey and other contract models)
  • Schedule analysis (P6 / MS Project)
  • Earned Value Management (EVM)
  • Progress reports and forecasting
1.2

Claims, Expert Witness & Litigation

  • Delay and Forensic Schedule Analysis: TIA, Windows and As-Planned vs As-Built
  • Extension of Time (EOT) assessment
  • Productivity, disruption and inefficiency analysis
  • Quantification of damages and claim-related costs
  • Independent review of third-party claims and expert reports
  • Expert Witness and technical reports for arbitration, mediation and litigation
1.3

Risk Management

  • Risk identification and register
  • Quantitative analysis (Monte Carlo) and probability of meeting the schedule
  • Mitigation plans
1.4

Tenders & Proposals (EPC / EPCM)

  • Technical and commercial proposals for EPC, EPCM and engineering services
  • Scope definition, execution strategy and deliverables
  • Technical proposal: methodology, WBS, staffing plan, master schedule and risk matrix
  • Commercial proposal: CAPEX estimating under AACE Class 5 to Class 1, productivity, contingencies and cost structure
  • Scope covering construction, installation, pre-commissioning, commissioning and start-up
  • Baseline schedule development and audit against the 14 DCMA metrics for client approval
1.5

FEL Development & Investment Evaluation

  • Project development through FEL-1 (Identification), FEL-2 (Conceptual) and FEL-3 (Feasibility)
  • Basic and detailed engineering
  • Techno-economic evaluation of alternatives: CAPEX, OPEX and Life Cycle Cost (LCC)
  • Profitability indicators: NPV, IRR and Payback
  • Technical input for Project Gate Reviews and phase-advance decisions
Line 2

Plataforma GRATOX

Your own SaaS, so the project reports itself, every day.

Log in to the platform
2.1

Schedule Intelligence

  • Automatic parsing and analysis of P6 (XER) and MS Project (MPP) files
  • Inconsistency detection and alerts
  • AI-powered schedule health dashboard
2.2

Daily Report Manager

  • Daily field log
  • Actual vs. planned progress
  • Photos, comments, automatic KPIs
2.3

Live Risk Manager

  • Real-time risk logging and tracking
  • Status indicators and automatic alerts
  • Risk evolution history
2.4

Change Management

  • Change control linked to the contract
  • Automated approval workflow
  • Real-time cost and schedule impact
Who advises you

The team behind the advisory and the platform.

Three engineers with real field experience. We are not an agency or a generic product.

Joao Tozzo G.

Joao Tozzo G.

Co-founder · Principal Consultant & Developer

Construction Engineer with over 10 years of experience in planning, scheduling and control of infrastructure projects, including work on Lines 3, 6 and 7 of the Santiago Metro.

Co-founder of GRATOX and responsible for leading the end-to-end design, development and implementation of the platform, combining expertise in project management, data analysis and technology to build solutions focused on control and decision-making.

LinkedIn
Rafael Valecillos

Rafael Valecillos

Co-founder · Principal Consultant

Consultant with over 15 years of experience leading underground and rail infrastructure programs and projects under EPC models.

Specialist in project planning and control, Earned Value Management, schedule analysis and claims management, bringing a strategic vision for decision-making, risk anticipation and meeting contractual objectives.

LinkedIn
Germán Blasco R.

Germán Blasco R.

Co-founder · Principal Consultant

Civil Engineer and Construction Superintendent with over 15 years of experience in management control and field operations leadership for residential, commercial, infrastructure and renewable energy projects.

Specialist in developing local artificial intelligence tools and advanced algorithmic systems applied to process optimization, financial analysis and integral project control. He also has experience in drone-based site inspection, interpretation of structural, civil and MEP drawings, and OSHA 10 certification.

LinkedIn
How it works

From your schedule (P6 or MS Project) to the management report, in four steps.

1

Import your schedule

Upload your baseline and progress from P6 or MS Project. GRATOX builds the WBS structure and critical path automatically.

2

The field reports

Each crew logs daily progress, man-hours and notes directly against the schedule activities.

3

AI compares

The system cross-checks planned vs. actual, calculates KPIs and flags deviations as soon as they appear.

4

Management decides

The executive dashboard is ready for any meeting, without building a report from scratch every week.

Native integrations

It speaks the same language as your planning team.

No manual conversions, no bridge spreadsheets between systems.

Primavera P6 (.XER) MS Project Excel export PDF reports
Packages

Ways to work with GRATOX.

No fixed plans or list prices yet: each package is sized to your team and number of projects. Let's talk and build yours.

Starter

For your first project on GRATOX

Custom quote

  • Schedule Intelligence and Daily Report Manager
  • Schedule import (P6 or MS Project)
  • 1 active project
  • Email support
Let's talk

Enterprise + Advisory

Platform plus expert hands-on support

Custom quote

  • Full platform: all 4 modules, unlimited projects and users, and AI executive dashboard
  • Planning and control advisory included
  • Guided implementation and data migration
  • Custom integrations
Let's talk

Shall we talk about your project?

Tell us what you're managing and we'll put together the best mix of advisory and platform with you.